Run a full quarterly review and set your actions for the next three months.
Before you open your checklist, put everything you'll need within reach: this quarter's bank statements, your income and expense spreadsheet, the balance of each pot, your set-aside worksheet from lesson 2.4, your cover map and your rate sheet. When all of that is already on the desk, the review takes about an hour.
You've reached the course's closing project, the point every earlier module was building towards. Over the course you set up a base-pay system, a tax and MediSave pot, a CPF decision, a records folder, a structure decision, a cover map, a rate sheet, a checklist and a calendar. Any one of them can run by itself. A quarterly review is the check you repeat each quarter so that they keep running together. Allow about fifty minutes for the project. Expect the first review to be the hardest, simply because you have never done one before.
Take out the checklist you built in lesson 8.1. Start at the first item and finish at the last, and beside each one write a status: a number, a yes or no, or a few words of note. If an item shows a problem, write the problem down and carry on to the next item, leaving the fixing until the pass is finished. Reviews that turn into a working session at the first problem seldom get to the final item, and the final item could be the important one.
Mei, the freelancer whose business you have tracked through every module, sat down for her first review in the October after her third quarter (her figures are invented). Her invoices for the quarter came to S$16,400, close to the S$16,500 she billed in the same quarter a year earlier. Of that, S$13,800 had actually arrived. Overdue invoices totalled S$4,800, compared with S$1,200 in March. The holding account had S$11,600 in it, short of its S$13,800 target, and it had dropped in each of the last two quarters.
Most of her records were filed. September's receipts were missing, so she wrote that she would file them the following morning. Her laptop still had no insurance. Because her deadlines now sit closer together than when she made her cover map, losing the laptop for a week would cost her more than it would have then. Nothing else on the cover map had changed. Her effective rate across the quarter's projects worked out at S$78 an hour, which clears her S$57 floor but falls short of her S$85 target. Most of that shortfall came from one project that went past its revision limit.
Every review brings three figures up to date. Redo the lesson 2.4 worksheet with the income you actually received this quarter, and adjust your set-aside percentage if the old one no longer fits. Look at which way your holding account has been moving and decide whether to hold, cut or raise your base pay, following lesson 8.2. If this is the review where you meant to make a voluntary CPF contribution, confirm first that your buffer and pot are both funded, the check from lesson 3.4.
When Mei redid the worksheet on her received income, her tax and MediSave pot was where it should be, so her set-aside stayed at 11%. Her base pay went down from S$2,300 to S$2,200, since the holding account was under target and had fallen two quarters running. At S$2,200 her essential spending was still covered.
Limit yourself to three actions at most for the next quarter, drawn from the statuses you just wrote. The cap is deliberate, because a review that produces twelve actions usually ends with none of them done. Each action has to be a specific task with a date attached. "Sort out insurance" does not qualify. Booking a meeting with a licensed adviser about disability income cover by 15 February does.
Mei read back over her statuses and pulled out these three:
ring both agency clients who pay late and agree milestone payments for any new work, by 20 October put a revision limit into her standard contract and her rate sheet, by 31 October get a quote for equipment cover, by 30 November
While the laptop is still open, put the next review into your calendar. A review without a booked slot tends to drift, and once one drifts the next usually does as well. Mei's next one sits in her calendar for the second week of January.
Your finished review fits on a single page. It holds a status for every checklist item, the updated set-aside percentage, base pay and CPF plan, your three dated actions, and the date of the next review, already booked. Put the page in your records folder. After a year you will have four of them, one per quarter, and together they show how your business has moved. Your annual review then begins from those four pages instead of from what you remember.
Pick a quiet hour this week, open your checklist and your statements, and run the review from the first item to the last.
Finish the review, write down three actions with dates, and book your next quarterly review in your calendar.
Junxiong-WFG Organisation is an authorised representative of AIA Financial Advisers Private Limited (Reg. No. 201715016G).