A free, interactive Singapore renovation checklist. Track every step from budgeting and quotes to permits, carpentry and the final defects inspection, saved on your device.

Your ticks are saved on this device only. A typical HDB renovation runs about 8 to 12 weeks.
| Rule | What to know |
|---|---|
| Permit approval | Works start only after approval |
| Deadline to finish | ~1 month (resale) / ~3 months (new BTO) |
| Needs a permit | Hacking, plumbing, floor finishes, major works |
| No permit needed | Painting, built-in carpentry, light fittings |
| Renovation hours | General works Mon-Sat 9am-6pm; noisy works Mon-Fri 9am-5pm only |
| New flat toilets | Wait 3 years from block completion before replacing toilet floor and wall finishes |
| Unauthorised works | Reinstatement at your cost + a fine of up to S$5,000 |
Your HDB-registered contractor applies for the permit. Exact hours and rules vary by town council. Confirm with HDB before starting.
Figures checked 5 Oct 2026.
Budgeting and planning, getting quotes and appointing a contractor, the defects check (for a BTO), design and 3D, permits, hacking, masonry/plumbing/electrical, tiling, carpentry, painting, fittings, deep clean, and the final handover and defects inspection. This checklist walks you through each one.
A full HDB or condo renovation typically takes about 8 to 12 weeks, and a resale flat can take a little longer because of hacking and rewiring. Light cosmetic work can be done in a few weeks.
Yes, for most HDB renovation works your HDB-registered contractor applies for the permit on your behalf. Noisy works such as hacking are allowed only Mon-Fri 9am-5pm (not on weekends, public holidays or the eves of 5 major holidays), and the toilet floor and wall finishes in a new block must not be replaced for 3 years from its completion.
An interior design firm manages the whole project and design for a fee; a direct contractor is cheaper but you coordinate more yourself. Either way, get at least three quotes and check the contractor is HDB-registered for HDB flats.
Yes. Your ticked steps are stored in your browser on this device, so you can return any time. Use the reset button to start over.
Your HDB-registered contractor applies for the permit. HDB does not state a processing time on its renovation pages, so apply early and plan it into your timeline. Permitted works start only after approval, and you must finish within 1 month for an existing block or 3 months for a newly completed one.
Structural and major works (hacking walls, moving the kitchen, plumbing and floor finishes) need a permit. Cosmetic works like painting, installing built-in carpentry or changing light fittings generally don't. When in doubt, your contractor or HDB can confirm before work starts.
HDB can require you to reinstate the flat at your own cost and impose a fine of up to S$5,000. Renovation hours are also restricted (noisy works Mon-Fri 9am-5pm only, none on weekends or public holidays), so use a registered contractor and get the permit.
These calculators provide general estimates for educational purposes only and are not personalised financial advice. Results may rely on rates and rules that change over time, so verify against official sources (IRAS, CPF Board, HDB, MAS) or consult a licensed financial adviser before making decisions.